Background

Gateway WA Perth Airport and Freight Access Project. The project required site power during the construction phase for use by the contractor. Perth Airport’s construction spread over a large area reaching many different access roads which will eventually lead to airport. Each of these sites need sufficient prime power to achieve construction goals and complete construction as soon as possible!

Objective

PR Powers team needs to supply reliable power for onsite transportable site offices and other ancillaries to complete day/night works and meet the completion dates for the project. Each of the sites will reach a different maximum load. Each Diesel Generator supplied will be specialised for each specific site to supply ongoing power.

Solution

The team has measured each individual site for the required maximum load and have supplied sixteen Diesel Generators of various sizes as per power requirements to site. The PR Power Diesel Generators supplied will successfully provide ongoing, reliable site power for the contractor on all sites.